| Sign In | Join Free | My fnxradio.com |
|
Certification : ISO;CE
Place of Origin : China
Payment Terms : L/C,T/T
Supply Ability : 1500-2000units/month
Packaging Details : By Pallet or As Request
Floor structure : Q235 galvanized Steel profile with Automatic Powder Coated paint
Window : PVC sliding window, double glass, with fly screen
Corner pillar : Q235 galvanized Steel profile with Automatic Powder Coated paint
Roof structure : Q235 galvanized Steel profile with Automatic Powder Coated paint
Brand Name : YAGO Industry
Model Number : YGCJ07
MOQ : 6units
Delivery Time : 25-45days
Wall panel : 50mm/75mm fireproof Mineral Rockwool Sandwich panel
Roof covering : Galvanized Powder Coated color painting steel Sheet
| Project name: Flatpack Container 6.06*2.435*2.89m | ||||
| A | Item | Specification | ||
|---|---|---|---|---|
| Steel Frame System System | ||||
| 1 | Roof structure | Main roof frame: Q235 galvanized Steel profile, with Automatic Powder Coated paint Roof purlin: C Section Steel, galvanized. Q235B steel | ||
| 2 | Floor structure | Main floor frame: Q235 galvanized Steel profile,with Automatic Powder Coated paint Floor purlin:C Section Steel, galvanized. Q235B steel | ||
| 3 | Corner pillar | Q235 galvanized Steel profile, Galvanized with Automatic Powder Coated paint | ||
| Container roof System | ||||
| 1 | Roof covering | Galvanized Powder Coated color painting steel Sheet. | ||
| 2 | Insulation | Fiber glass with aluminum foil | ||
| 3 | Ceiling board | Galvanized Powder Coated color painting steel Sheet. | ||
| Container floor System | ||||
| 1 | PVC flooring | Vinly floor leather with glue | ||
| 2 | Floor board | 18mm fiber cement board | ||
| ContainerWall System | ||||
| 1 | Wall panel | 50mm /75mm fireproof Mineral Rockwool Sandwich panel | ||
| 2 | Door | Insulated Steel Door | ||
| 3 | Window | PVC sliding window, double glass, with fly screen | ||
| Container Electrical System | ||||
| 1 | Power distribution cabinet | Circuits with air-break switch, leakage protector, | ||
| 2 | Light | LED light, 24W | ||
| 3 | AC Socket | 16A universal, with socket box | ||
| 4 | Common Socket | 10A, Universal type, with socket box | ||
| 5 | Switch | 10A , with switch box | ||
| Plumbing system(Optional as per drawing) | ||||
| 1 | washbasin | including the accessory | ||
| 2 | Closetool | including the accessory | ||
| 3 | shower | shower base, shower head, water mixture | ||
| 4 | Exhaust Fan | 6 Inch | ||
| 5 | water pipe | input and output water pipe | ||
| Stair case and Corridor. (Optional as per drawing) | ||||
| 1 | Stair Case and Corridor | Fabricated with C channel steel, square tube, Round Steel, And checkered Steel Plate | ||
| Additional Traingle Roof on Top of Each Block. (Optional as per drawing) | ||||
| 1 | Roof Structure | Fabricated with C section steel, Galvanized Q235 Steel. | ||
| 2 | Roof Covering | Corrugated Galvanized Powder Coated Roof Tile | ||
Q1: How many people can this integrated camp accommodate?
A1: Customized design supports camp scale from 10 persons to 5000 persons.
Q2: How to solve water, electricity and sewage discharge problems in remote areas?
A2: We support matching diesel generator set, fresh water purification system and integrated sewage treatment equipment to realize self-sufficient camp operation.
Q3: Can it work normally in severe cold regions?
A3: Reinforced thermal insulation layer and professional heating system can be equipped to adapt to environment temperature as low as -40℃.
Q4: How long does it take to finish whole camp construction?
A4: The whole process including design, production and on-site installation can be completed within 30 to 60 days.
Q5: Is it convenient for camp relocation?
A5: Full modular design enables quick disassembly, convenient container transportation and secondary reconstruction in different regions.


|
|
Steel Structure Mining Site Accommodation House Prefabricated 75mm Images |